
St George Mining Ltd (ASX:SGQ, FRA:S0G, OTC:SGQMF) has delivered its thickest and most compelling drill result yet from the Araxá Rare Earths and Niobium Project in Brazil, with a standout intercept of 178.7 metres at 4.34% total rare earth oxides (TREO) and 0.75% niobium oxide (Nb₂O₅) from surface.
The result — the thickest mineralised interval recorded at Araxá to date — underscores the scale, grade and near-surface continuity of the deposit, reinforcing its status as one of the most significant undeveloped rare earths and niobium projects globally.
It forms part of a broader batch of assay results from 15 diamond drill holes, with multiple wide, high-grade intercepts continuing to demonstrate consistency across the system.
Oblique section showing the latest diamond drill holes as well as other significant drilling completed in the current campaign. The latest drill holes with red labels.
Among the highlights:
-
165.3m at 4.28% TREO and 0.61% Nb₂O₅ from surface
-
150.2m at 4.64% TREO and 0.59% Nb₂O₅ from surface
-
163.65m at 3.29% TREO and 0.45% Nb₂O₅ from surface
-
81.05m at 5.14% TREO and 0.64% Nb₂O₅ from surface
These results continue to highlight a defining feature of Araxá — very thick, high-grade mineralisation starting at surface, supporting the potential for a low-strip, open-pit mining operation.
Section A – A’ showing high-grade TREO intercepts (cut-off 1% TREO) and high-grade Nb2O5 intercepts (cut-off 0.2% Nb2O5) along with the existing MRE outline.
Executive chairman John Prineas said the combination of scale and grade, particularly from surface, sets Araxá apart from comparable projects.
“The drilling results continue to show huge true widths from surface paired with very high grades,” he said.
“This unique combination is unrivalled among emerging rare earths and niobium developers,” he added. “The commercial advantage of high-grade mineralisation starting from surface — as opposed to 50 metres or even more than 100 metres below surface — cannot be underestimated.”
Section B – B’ showing high-grade TREO intercepts (cut-off 1% TREO) and high-grade Nb2O5 intercepts (cut-off 0.2% Nb2O5) along with the existing MRE outline, showing the expansion of the existing MRE.
High-grade system continues to expand
Drilling at Araxá has now been running continuously for more than six months, with the current program designed to both expand and upgrade the mineral resource estimate.
The latest results demonstrate strong grade continuity over broad intervals and suggest further upside, with the mineral system remaining open in all directions and at depth.
latest_posts
- 1
Old photos misrepresented as aftermath of political party supporters' brawl in Bangladesh - 2
Figure out How to Keep up with Oral Wellbeing During Pregnancy - 3
Fireballs and a full moon. Here’s how to see two celestial events this week - 4
Support Your Wellness: 20-Minute Home Exercises That Work - 5
High Court freezes government move to shutter Army Radio pending ruling
Congo declares its latest Ebola outbreak over, after 43 deaths
Windows to the Previous: An Excursion Through the World's Notable Engineering
Twelve injured near Beit Shemesh, reports of shrapnel impact in Eilat as Iran targets Israel
Iran war fuels fears of new inflation wave among German consumers
Tributes pour in for MIT professor Nuno Loureiro amid unresolved shooting case
Rights group: At least 2,500 deaths during protest crackdown in Iran
From Sea shores to Urban areas: Astonishing Worldwide Travel Objections
Figure out how to Consolidate a Brain science Certificate with Social Work
As infant botulism cases climb to 31, recalled ByHeart baby formula is still on some store shelves













